Smart Solutions

P1 Group Installs Aquatherm PP-R Piping, Saving Time When Every Second Counts

Thanks to the light weight of Aquatherm PP-R piping, P1 Group workers were able to prefabricate large sections in their shop, transport them to the jobsite, and hoist them into place quickly, saving much-needed time for a 24-hour installation job.

By using Aquatherm polypropylene-random (PP-R) Blue Pipe® to replace carbon-steel pipe at Berry Global’s injection-molding facility, the P1 Group of Lawrence, KS, successfully completed installation in just 24 hours. The lightweight pipe is easy to transport and easy to join using a flameless heat-fusion technique that saves time. The speed of installation was more than just a productivity win for the contractor; at Berry Global, a mere half-second loss in production time can cost tens of thousands of dollars.

A Tricky Transition

Berry Global needed to replace a large portion of pipe used to transport cooling water to more than 20 injection-mold and thermoforming machines. The existing carbon-steel piping, along with an undersized chilled-water storage tank, showed excessive corrosion. Cooling the molds is a critical, time-sensitive part of the injection-molding process; the plant already had begun to incur losses because rust and pipe scale were interfering with the cool-water flushing of the molds.

“Our [cooling] cycle time on some of the equipment had increased due to hot cores. This resulted in significant losses in production,” said Jacob Francis, facility maintenance supervisor. Increasing production demands on an undersized storage tank and piping system exacerbated the complex problem.

The system itself is simple. Chilled water leaves the chiller at 55° F and flows directly to the injection-molding equipment. Water exits through orifices in the aluminum or steel molding equipment and circulates to what was originally a 4,000-gallon holding tank before circulating back through the chiller. However, according to Francis, at the required 3,800 gallons per minute, the water never had an opportunity to “settle,” causing air to be absorbed within the system. The completely aerated system not only was rusting badly, but the excessive air also prevented water-treatment chemicals from adhering to and protecting the carbon-steel pipe effectively. Corrosion already had eaten two holes in the chilled-water tank.

The situation would only get worse until the piping was replaced, but that created an even greater challenge: How do you replace 300’ of 10” and 16” welded steel pipe for a manufacturing process that virtually never stops? The plant in Lawrence, one of Berry Global’s 130 facilities around the world, produces food-grade plastic cups and containers for various restaurants and
food and beverage industries. The plant operates 24/7, every day of the year, save a day or two at Thanksgiving and Christmas. Shutting down operations for just one hour comes at a high price—one Berry Global most certainly would have to pay several times over if the piping were replaced with field-welded carbon steel, which can take a long time to install.

Aquatherm Eases Installation

Todd Mihalchik, industrial mechanical estimator and project manager for P1 Group, suggested Aquatherm PP-R piping systems, even though no one from P1 Group had installed Aquatherm pipe in such large diameters. Mihalchik’s conversations with local representatives from the Lawrence branch of Ferguson, a wholesale distributor of plumbing and mechanical supplies with 1,400 locations serving customers throughout the United States, Puerto Rico, the Caribbean, and Mexico, convinced him that the piping might be the answer for his longtime client, Berry Global.

Wedged between a costly shutdown and a rapidly deteriorating system, Francis agreed. He gave P1 Group the green light to install Aquatherm Blue Pipe to replace the chilled-water piping serving two thirds of the plant’s injection-molding processes.

Unlike metal pipe, which must be welded into place at the jobsite, Aquatherm pipe components are joined using a safe and simple heat-fusion process to create virtually leak-proof connections in minutes. Because the product is so lightweight, large sections can be fabricated in a contractor’s shop—or in Lindon, UT, at Aquatherm’s North America headquarters—then easily transported to the jobsite. Because Aquatherm PP-R is completely noncorroding, it will not break down, weaken, or scale like metal piping systems and does not require chemical
treatment.

“At first, we were going to have three days for the actual installation, but that got whittled down to just 24 hours. … The timeframe was really challenging, but Aquatherm made things a lot easier.”

—Todd Mihalchik, Industrial Mechanical Estimator and Project Manager, P1 Group

At a training session held just prior to the Berry project, installation specialists Aquatherm Regional Sales Manager Mike Engle and Ferguson’s Nathan Geyer taught P1 Group technicians the appropriate heat-fusion procedures. “About five or six of our installers attended the five-hour course taught by Aquatherm, where they learned all the different heat-fusion welding techniques,” Mihalchik said.

The installation included the construction of a new 10,400-gallon outdoor chilled-water tank, 16” supply and return piping to and from the tank, and assorted lengths of 12” and 10” piping connecting a 16” Aquatherm header to the various injection-mold presses. Nearly all the piping sections were fabricated in advance at P1 Group’s fabrication shop, then installed using rented butt-welding equipment and handheld socket-fusion equipment. The only exception was the 16” header, which Aquatherm’s Design & Fabrication Services team fabricated because P1 Group did not have ready access to the welding equipment needed for the large-diameter pipe.

The fabricated piping sections, some of which were 15’ or longer, were lightweight enough for just two workers to carry into the installation space and hoist into place—a huge advantage for P1 Group, given the project’s ever-shrinking installation window. “At first, we were going to have three days for the actual installation, but that got whittled down to just 24 hours on Good Friday before Easter. The timeframe was really challenging, but Aquatherm made things a lot easier,” said Mihalchik.

A “Fortunate Mistake”

Aquatherm Polypropylene-random (PP-R) Blue Pipe®
P1 Group workers quickly learned the flameless heat-fusion welding techniques required to join Aquatherm PP-R Blue Pipe, which is not only safer than traditional welding but also saves time.

The only glitch, which occurred during the all-night installation, turned into a blessing for Mihalchik and his crew. At one point, the installers discovered that two of the 10” lines off the 16” header had been cut too short. It might have been a panic-inducing discovery if not for Engle, Geyer, and Ferguson’s Kent Cramer, who were at the jobsite during the installation and were able to oversee some impromptu pipe fusion to adjust the length of the 10” pipe.

“They showed us how easy a fix it really was. In a way, it was a fortunate mistake because now we know we can work through it easily on our own. I’m a 100-percent believer in Aquatherm now for sure,” Mihalchik said.

Francis is equally convinced he made the right decision choosing Aquatherm. In fact, he had another 700’ of Aquatherm Blue Pipe installed for domestic water service to Berry’s nearby warehouse, and he looks forward to identifying even more opportunities to use Aquatherm piping.

No Insulation Required

Aquatherm Polypropylene-random (PP-R) Blue Pipe®
P1 Group recommended Aquatherm PP-R piping systems for Berry Global’s injection molding facility because they resist corrosion, rust, and scale, eliminating future downtime caused by pipe corrosion. Workers were able to install 300’ of new pipe in just 24 hours.

“The fact that we didn’t have to insulate the pipe is another huge benefit. None of the indoor pipe had to have any insulation, even though we are carrying 55° F water in an 80° F ambient space,” Francis said. Francis added that despite some extremely warm, humid days since the pipe was installed, he has yet to see a drop of condensation on the Aquatherm pipe. “I have one flange where carbon-steel pipe meets the Aquatherm,” said Francis. “I can put a hand on each and feel that the Aquatherm is barely below room temperature while the carbon-steel pipe is really cold.”

An inherent low thermal conductivity (R-value of one or more depending on the pipe size and standard dimension ratio) makes insulating Aquatherm unnecessary in certain indoor applications. Not only does this save installation costs, it creates a cleaner, more uniform installation in which the pipe is exposed for easy inspection. “It really looks sharp,” said Francis, who also credited P1 Group for a very professional-looking installation.

The plant already has seen improvements in system performance, both in terms of chiller usage and pump efficiency. Perhaps even more important, the Berry plant has eliminated future downtime caused by pipe corrosion—at least where Aquatherm is installed. Furthermore, the company has all but eliminated the need for chemical treatment in its piping system. “For a process project like this, Aquatherm was a no-brainer choice,” Francis said.