Jay R. Smith Crafts Speedy Solution for J.W. McClenahan’s Drainage Dilemma

October 30, 2017

Faced with new, more stringent building requirements mid-project, J.W. McClenahan Co. got a boost from the engineers at Jay R. Smith Mfg. Co.,® who rapidly designed new trench drains and had them verified by a third party to satisfy city inspectors—all in just four months.

LEARN MORE

Looking for More Smart Solutions?

Visit the Smart Solutions Case Studies area of our website! You’ll see how other mechanical contractors found their win-win with productivity-enhancing and cost-saving applications from members of MCAA’s Manufacturer/Supplier Council.

Plus, you’ll find tips and ideas on other ways you and your company can save money and enhance your productivity.

VISIT SMART SOLUTIONS

Related Articles
Following an energy audit, McKinstry specified Uponor’s flexible Ecoflex preinsulated piping to resolve a remote Minnesota school’s longtime heating problems and save the school thousands in energy costs. Ecoflex proved easy to install, allowing workers to lay hundreds of feet of piping in just one week.…
MCAA’s Virtual Trade Show connects our contractor members with the members of MCAA’s Manufacturer/Supplier Council.…
Prefabrication was just one of the ways that Olson Plumbing and Heating leveraged Viega ProPress to take on a mountain of a project: building a new visitor’s complex at the summit of Pikes Peak that met strict environmental standards … during the COVID-19 pandemic. “We prefabbed all the domestic and hydronic piping, as much as we could, to minimize labor at the top,” said Josh Crippen, superintendent at Olson. “We prefabbed our pump skids, all the water heater and boiler skids, all the waste and vent piping. As much as possible.”…
The Manufacturer/Supplier Training area of MCAA’s website connects our contractor members with training opportunities available from the members of MCAA’s Manufacturer/Supplier Council.…