HOLDRITE Products Solve Jobsite Challenges for PAR Plumbing

July 6, 2017

When PAR was contracted to provide all of the plumbing for Riverside K, a 32-story luxury condominium on Manhattan’s West Side, they knew that space inside the walls would be tight. HOLDRITE support systems made for a simpler installation while also saving PAR time.

LEARN MORE

Looking for Solutions to Your Installation Challenges?

Visit the Smart Solutions Case Studies area of our website! You’ll see how other mechanical contractors found their win-win with productivity-enhancing and cost-saving applications from members of MCAA’s Manufacturer/Supplier Council.

Plus, you’ll find tips and ideas on other ways you and your company can save money and enhance your productivity.

VISIT SMART SOLUTIONS

Related Articles
Following an energy audit, McKinstry specified Uponor’s flexible Ecoflex preinsulated piping to resolve a remote Minnesota school’s longtime heating problems and save the school thousands in energy costs. Ecoflex proved easy to install, allowing workers to lay hundreds of feet of piping in just one week.…
MCAA’s Virtual Trade Show connects our contractor members with the members of MCAA’s Manufacturer/Supplier Council.…
Prefabrication was just one of the ways that Olson Plumbing and Heating leveraged Viega ProPress to take on a mountain of a project: building a new visitor’s complex at the summit of Pikes Peak that met strict environmental standards … during the COVID-19 pandemic. “We prefabbed all the domestic and hydronic piping, as much as we could, to minimize labor at the top,” said Josh Crippen, superintendent at Olson. “We prefabbed our pump skids, all the water heater and boiler skids, all the waste and vent piping. As much as possible.”…
The Manufacturer/Supplier Training area of MCAA’s website connects our contractor members with training opportunities available from the members of MCAA’s Manufacturer/Supplier Council.…
Load More...