ASHRAE Endorses MCAA Change Order Publication, Making it an MEP Industry Standard

August 11, 2022

The American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) has fully endorsed the 2020 edition of MCAA’s Change Orders, Productivity, Overtime—A Primer for the Construction Industry. ASHRAE’s endorsement joins those of the Sheet Metal and Air Conditioning Contractors’ National Association (SMACNA), the National Electrical Contractors Association (NECA), and the American Subcontractors Association (ASA), making the guide an industry standard for the mechanical, electrical, and plumbing (MEP) industries.

MCAA welcomes ASHRAE to the roster of endorsing organizations. We look forward to the participation of all endorsing organizations as we develop future editions of the publication.

The guide is a planning tool to assist contractors in determining the costs associated with unplanned events, circumstances and factors that may impact the outcome, productivity, and schedule of construction projects. It includes a chapter highlighting the benefits of sharing native critical path method (CPM) schedule files.

MCAA members can download the guide free as a benefit of membership. Printed books are also available for purchase.

Related Articles
Workplace head injuries remain a significant concern in the construction industry. To address this, the John R. Gentille Foundation (JRGF), ELECTRI International, the American Society of Concrete Contractors (ASCC), and The Association of Union Constructors (TAUC) have partnered with the Virginia Tech Helmet Lab on a study to improve industrial helmet safety. The success of this research depends on industry participation to provide real-world data on workplace head injuries for use in developing test protocols. Help advance helmet technology, reduce the risk of traumatic brain injuries, and make a lasting impact on worker safety. Take the survey today!…
The Manufacturer/Supplier Training area of MCAA’s website connects our contractor members with training opportunities available from the members of MCAA’s Manufacturer/Supplier Council.…
Using MILWAUKEE TOOL’s new line of wet/dry vacuum solutions helps Pan Pacific Mechanical better keep its workspaces clean, which enhances productivity. Pan Pacific also found the cordless vacuums safer, more versatile, and more durable than corded vacuums.…
MCAA25 is sure to be an incredible experience for all attendees. If education is what you’re craving, you’re in luck because MCAA25 is packed with dynamic sessions designed to arm mechanical contractors with the tools and strategies they need to navigate today's challenges and drive sustainable growth in the future. Secure your spot now—because success starts with education at MCAA25!…
Load More...